Rate 44 - New Construction Large Power User - Three Phase


Three Phase New Construction Large Power User Incentive Rate – Rate 44

Effective April 1, 2016

Available to new construction three phase consumers, requiring more than 100 kVA transformer capacity, subject to the rules and regulations of the Cooperative.  Consumers qualifying for this incentive rate are newly constructed commercial and industrial loads and new schools.  Seasonal services such as grain bins and irrigation pumps do not qualify for this rate.

SERVICE AVAILABILITY:     $80.00
DEMAND CHARGE:            $10.00 per kW
ENERGY CHARGE:              kWh at $0.0765

Billing demand is the average demand in kilowatts for the 15 minutes of greatest power use during the month, adjusted for power factor as provided below, but not less than any higher minimum billing demand specified by contract.

The consumer will maintain unity power factor as nearly as practicable.  The billing demand may be increased one percent for each percentage point by which the average power factor is less than 90%.

The minimum monthly charge shall be the higher one of the following charges.
1.    The billing demand as specified above.
2.    The minimum monthly charge specified in the contract.